← Back to All ProjectsProject #1 of 13 • Executed by SSE
Audited Contract Value₹24.00 Lacs
Commencement Date18-Dec-2018
Stipulated & Actual Completion2 Months (18-Mar-2019)
Arbitration / Litigation StatusNil / Clear
Executive Engineering Summary
Executed fast-track MEP infrastructure for Flipkart's F1 Info Solutions & Services technical hub at Sector-63, Noida. The project encompassed LT power distribution panels, workstation power reticulation, addressable fire detection, hydrant integration, and sanitary plumbing networks.
Electrical DistributionFire SafetyPHE
Detailed Technical Scope of Work
- Supply, installation, testing, and commissioning of LT electrical distribution boards and sub-main cabling.
- Internal fire hydrant landing valves, hose reels, and branch pipe assemblies across all floors.
- Addressable fire alarm detectors, manual call points, hooters, and control panel integration.
- Complete Public Health Engineering (PHE) water supply and drainage piping for technical bays.
- Earthing stations, lightning protection, and statutory electrical safety load testing.
Plant Room & Infrastructure Gallery
Client Details
Sponsoring Organization
Flipkart (F1 Info Solutions & Services Pvt. Ltd.)
A-214 Okhla Industrial Estate, Phase-1, New Delhi-110020
System Parameters
Technical Specifications
Facility TypeIT & Technical Services Center
Fire StandardNBC 2016 Part-4 Compliant
Electrical Load415V 3-Phase LT Distribution
Execution ModeFast-Track 60-Day Turnkey